Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930006 (1) ·
930120 (1) ·
930195 (1) ·
930362 (1) ·
930367 (1) ·
934125 (1) ·
934327 (1) ·
935202 (1) ·
935203 (1) ·
935209 (1) ·
937702 (1)
'.5mi East US1 Lakeworth ' (1) ·
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2Mi S of 45TH ST(CR702)' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.4M S OF ROYAL PALM ' (1) ·
'1mi. West of US-1 ' (1) ·
'3 Miles West of SR-786 ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'No. City Line Boca Raton ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 11 results in range #1 to #11.