Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C. Stanley Weaver Canal ' (1) ·
'CANAL E-4 ' (1) ·
'E-2W Canal ' (1) ·
'E-3 CANAL ' (1) ·
'G-370 East Inflow Canal ' (1) ·
'G-370 West Inflow Canal ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-30 CANAL ' (1) ·
'L-38 CANAL ' (1) ·
'L-5 Canal ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LWDD E-2W CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD L-38 CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'SR-91 TPK & BOCA RIO RD.' (1) ·
'SR-91/TPK & BOCA RIO RD.' (1)
'CLINT MOORE RD. EB' (1) ·
'CONGRESS AVE NB ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'JOG ROAD SB ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'PALM B LAKE BVD WB' (1) ·
'PALMETTO PK RD(EB)' (1) ·
'PALMETTO PK RD(WB)' (1) ·
'SB US-27 SR-25 ' (1) ·
'SW 23RD AVE. ' (1) ·
'US-27 (SR-25) NB ' (1) ·
'US-27 (SR-25) SB ' (1)
930302 (1) ·
930352 (1) ·
930437 (1) ·
930512 (1) ·
930513 (1) ·
934160 (1) ·
934161 (1) ·
934224 (1) ·
934907 (1) ·
934909 (1) ·
934915 (1) ·
934918 (1) ·
934930 (1) ·
934933 (1) ·
934935 (1) ·
934937 (1) ·
934948 (1) ·
934967 (1) ·
935308 (1)
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'1.9 Mile E of US441 ' (1) ·
'1MI N. of CLINT MOORE RD.' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2MI E of SR-7 US-441 ' (1) ·
'5 mi. N Broward Co. line ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Palm Beach - Broward Line' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)