Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Blue Heron Blvd. ' (1) ·
'Boynton Bch Blvd ' (1) ·
'Camp Site Road ' (1) ·
'Central Blvd. ' (1) ·
'Haverhill Road ' (1) ·
'I 95 SR 9 ' (1) ·
'Jog Road ' (1) ·
'SR-710 ' (1) ·
'SR91 N/S TPK 107.8' (1) ·
'SR91SB ON/OFF 98.0' (1) ·
'US 98 (SR 80) ' (1) ·
'US-98 US-441 SR-80' (1) ·
'US27 SR-25 & 80 ' (1) ·
'VILLAGE BLVD ' (1)
930054 (1) ·
930121 (1) ·
930146 (1) ·
930171 (1) ·
930178 (1) ·
930190 (1) ·
930344 (1) ·
930406 (1) ·
930439 (1) ·
930448 (1) ·
930449 (1) ·
930523 (1) ·
931005 (1) ·
934158 (1) ·
934171 (1) ·
934175 (1) ·
934373 (1) ·
937712 (1)
'.5mi W. of N. Lake Blvd. ' (1) ·
'0.3 Mi N of 45th St ' (1) ·
'0.4 mile North of 45th St' (1) ·
'0.5 mi. N of N Lakes Blvd' (1) ·
'0.5mi East of SR-786 ' (1) ·
'0.6 MI N OF NO LAKE BLVD ' (1) ·
'0.6mi East of Congress Av' (1) ·
'0.8MI S OF 45TH ST CR702 ' (1) ·
'0.95 MI N of PGA Blvd. ' (1) ·
'2.35MI E OF HENDRY CO LIN' (1) ·
'2.6 Mi. S of SR-710 ' (1) ·
'500' N OF SR-80 (S.BLVD) ' (1) ·
'800 ft. S of SR 704 Exit ' (1) ·
'BOYNTON BCH EAST OF TPK ' (1) ·
'BOYNTON BCH WEST OF TPK ' (1) ·
'In John Prince Park ' (1) ·
'Southern Blvd / E-3 Canal' (1) ·
'SR-80 3MI E. 20 MI BEND ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
103753 (1) ·
10875 (1) ·
11538 (1) ·
15789 (1) ·
180 (1) ·
19050 (1) ·
20574 (1) ·
21861 (1) ·
23076 (1) ·
297552 (1) ·
34353 (1) ·
369555 (1) ·
385170 (1) ·
63328 (1) ·
64195 (1) ·
65063 (1) ·
82413 (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)