Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'10TH AVE NORTH ' (1) ·
'BELVEDERE RD EB ' (1) ·
'BELVEDERE RD WB ' (1) ·
'CONGRESS AVE ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'DAVIS ROAD ' (1) ·
'FLORIDA MANGO RD ' (1) ·
'KUDZA ROAD ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'ORANGE TREE DR ' (1) ·
'PINETREE LANE ' (1) ·
'SEMINOLE DR ' (1) ·
'TROON DR ' (1)
934205 (1) ·
934206 (1) ·
934251 (1) ·
934254 (1) ·
934312 (1) ·
934319 (1) ·
934331 (1) ·
934332 (1) ·
934348 (1) ·
934516 (1) ·
935001 (1) ·
935002 (1) ·
936261 (1) ·
937201 (1)
'0.04MI S OF FOREST HILL ' (1) ·
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.1Mi S OF CR812 LANTANA ' (1) ·
'0.2MI S of FOREST HILL BV' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'1MI W OF SR 809 ' (1) ·
'2.2MI S OF SR-80 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)