Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-23 CANAL ' (1) ·
'DANFORTH CREEK ' (1) ·
'Drainage Canal ' (1) ·
'East Indian River Relief' (1) ·
'I-95 (SR 9) ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'ORANGE CANAL ' (1) ·
'POPPELTON CREEK ' (1) ·
'S Fork St. Lucie River ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'West Indian River Relief' (1) ·
'WILLOUGHBY CREEK ' (1)
'CITRUS BLVD. ' (1) ·
'CR 76A ' (1) ·
'CR-708 ' (1) ·
'CR-726 CITRUS BLVD' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'CR714 PALM CITY RD' (1) ·
'East Island Access' (1) ·
'INDIAN STREET ' (1) ·
'ISLAND WAY ' (1) ·
'MAPP ROAD ' (1) ·
'SR-76 ' (1) ·
'SR-76 (Kanner Hwy)' (1) ·
'US-441 SR-15 ' (1) ·
'US98/441 SR15/700 ' (1) ·
'WB Martin Downs Bd' (1) ·
'West Island Access' (1)
890039 (1) ·
890103 (1) ·
890107 (1) ·
890114 (1) ·
890141 (1) ·
890142 (1) ·
890143 (1) ·
890148 (1) ·
890149 (1) ·
890153 (1) ·
890154 (1) ·
890155 (1) ·
890156 (1) ·
890157 (1) ·
894029 (1) ·
894040 (1) ·
894044 (1) ·
894059 (1) ·
894060 (1) ·
894064 (1)
'0.1 MILE NORTH OF SR-714 ' (1) ·
'0.2MILE S OF SW BECKER RD' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1.5mi East of Indiantown' (1) ·
'1.7 Miles West of I-95 ' (1) ·
'1/2MI S of US-1 ' (1) ·
'11.4Mi N of Palm Beach Co' (1) ·
'3 MI. east of SR-710 ' (1) ·
'3.9Mi N. of Palm Beach Co' (1) ·
'4.7Mi N. of Palm Beach Co' (1) ·
'5.8Mi. E of SR-710 ' (1) ·
'7.4Mi N. of Palm Beach Co' (1) ·
'7.9 Mi N of Palm Beach Co' (1) ·
'CR 76A over I-95 ' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
'US-441 and SR-76 ' (1) ·
'West of Ernest Lyons Bri.' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.