Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > County 003:
Indian River
& Service Under 042b:
Waterway
& Substructure 060:
Satisfactory
Use the filters below to narrow your results.
'CANAL ' (1) ·
'COLLIER CREEK ' (1) ·
'Indian River ' (1) ·
'IRRIGATION DITCH #4 ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL G CANAL ' (1) ·
'Main Canal ' (1) ·
'NORTH RELIEF CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'RIO MAR BAY ' (1)
'21ST ST SW ' (1) ·
'53RD STREET ' (1) ·
'65TH ST. ' (1) ·
'74TH AVE. ' (1) ·
'90TH AVE ' (1) ·
'CARTER RD. ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'CR-632 (65TH ST.) ' (1) ·
'CR5A OLD DIXIE HWY' (1) ·
'FLEMING STREET ' (1) ·
'SR-510 Wabasso Rd ' (1) ·
'SR-60 Osceola Blvd' (1) ·
'SR510 Wabasso Road' (1) ·
'VETERANS WALK ' (1)
880018 (1) ·
880019 (1) ·
880030 (1) ·
880040 (1) ·
880044 (1) ·
880047 (1) ·
880049 (1) ·
880050 (1) ·
880051 (1) ·
880062 (1) ·
884015 (1) ·
884016 (1) ·
884020 (1) ·
884023 (1) ·
884036 (1) ·
884047 (1) ·
885604 (1) ·
885808 (1)
'0.3MI N of CR 512 ' (1) ·
'0.7 MILE NORTH OF SR-60 ' (1) ·
'0.7Mi East of US-1 ' (1) ·
'0.8MI E OF 58TH AVE. ' (1) ·
'0.9MI N OF CR-630 ' (1) ·
'1.2MI East of US-1 ' (1) ·
'1MI NORTH OF SR-60 ' (1) ·
'2.25Mi. W of US-1 ' (1) ·
'2.4MI S OF SR-60@90TH AVE' (1) ·
'2.6MI N OF SR-60 ' (1) ·
'25FT. EAST OF 66TH AVE. ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'3MI W OF CR-615 ' (1) ·
'AT 4TH STREET ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'INSIDE RIVERSIDE PARK ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)