Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Street ' (1) ·
'13th Street SW ' (1) ·
'16TH ST ' (1) ·
'1st St SW ' (1) ·
'26TH STREET ' (1) ·
'27th Street ' (1) ·
'37th Street ' (1) ·
'49th St Lindsey Rd' (1) ·
'4th Street ' (1) ·
'56th Place North ' (1) ·
'57th Street ' (1) ·
'5th Street ' (1) ·
'5th Street SW ' (1) ·
'CR-611 (45th ST.) ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'CR-612 8th Street ' (1) ·
'CR-630 (41st St.) ' (1) ·
'CR605 Old Dixie ' (1) ·
'SR-5 (US-1) NB ' (1) ·
'US-1 (SR-5) SB ' (1)
880103 (1) ·
880104 (1) ·
884056 (1) ·
884061 (1) ·
884066 (1) ·
884069 (1) ·
884070 (1) ·
884072 (1) ·
884073 (1) ·
884074 (1) ·
884075 (1) ·
884077 (1) ·
884082 (1) ·
884085 (1) ·
884086 (1) ·
884093 (1) ·
884101 (1) ·
884102 (1) ·
884103 (1) ·
884104 (1) ·
884105 (1)
'1.3 Mi. North of CR-606 ' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'2.1 Miles S of Oslo Rd. ' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'250ft North of SR-60 ' (1) ·
'30ft. E of 58th Ave/CR613' (1) ·
'56th Place North ' (1) ·
'5th St. SW at CR-611 ' (1) ·
'At 58th Ave ' (1) ·
'At 74th Ave ' (1) ·
'At CR-613 ' (1) ·
'At CR-613 - 58th Ave ' (1) ·
'At CR-613 (58th Ave.) ' (1) ·
'AT CR-615 - 66TH AVE ' (1) ·
'At CR-615 (66th Ave.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'At CR-615 (66th Avenue) ' (1)
27332870 (1) ·
27332944 (1) ·
27344850 (1) ·
27354064 (1) ·
27354128 (1) ·
27360764 (1) ·
27361500 (1) ·
27363390 (1) ·
27370020 (1) ·
27372705 (1) ·
27375405 (1) ·
27382201 (1) ·
27384653 (1) ·
27384680 (1) ·
27385110 (1) ·
27393890 (1) ·
27400430 (1) ·
27403120 (1) ·
27405750 (1) ·
27413623 (1) ·
27415031 (1)
80220651 (1) ·
80220740 (1) ·
80231300 (1) ·
80242065 (1) ·
80254872 (1) ·
80254929 (1) ·
80260616 (1) ·
80264781 (1) ·
80264806 (1) ·
80264839 (1) ·
80264867 (1) ·
80264892 (1) ·
80264917 (1) ·
80264970 (1) ·
80274502 (1) ·
80274510 (1) ·
80274550 (1) ·
80274570 (1) ·
80274600 (1) ·
80274670 (1) ·
80284503 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)