Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
880097 (1) ·
884067 (1) ·
884068 (1) ·
884081 (1) ·
884098 (1) ·
884099 (1) ·
884100 (1) ·
885811 (1) ·
885812 (1) ·
885813 (1)
'0.1 Mile West of A1A ' (1) ·
'0.3 Miles North of SR 60 ' (1) ·
'0.7Mi South of SR-60 ' (1) ·
'1.9 Mi South of SR-60 ' (1) ·
'10.3Mi. E of SR-91 (TPK) ' (1) ·
'100Ft. South of Bay Drive' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'At 74th Avenue ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)