Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
'4th St. and Canal D ' (1) ·
'90th Ave. ' (1) ·
'Blue Cypress Marsh ' (1) ·
'C-52 Canal ' (1) ·
'I-95 ' (1) ·
'ICWW ' (1) ·
'Indian River ' (1) ·
'Indian River Relief ' (1) ·
'Intracoastal Waterway ' (1) ·
'IRRIGATION DITCH #4 ' (1) ·
'L-78 Borrow Canal ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL C CANAL ' (1) ·
'LATERAL CANAL C ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL G CANAL ' (1) ·
'Main Canal ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'North Relief Canal ' (1) ·
'Old Dixie Hwy. & FEC RR ' (1) ·
'OUTFALL CANAL ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'Padgett Branch Marsh ' (1) ·
'RELIEF CANAL ' (1) ·
'RIO MAR BAY ' (1) ·
'Sebastian Inlet ' (1) ·
'South Relief Canal ' (1) ·
'SR 60 ' (1) ·
'St. John's Marsh ' (1) ·
'St. Johns Marsh ' (1)
'49th St Lindsey Rd' (1) ·
'4TH STREET ' (1) ·
'74TH AVE. ' (1) ·
'8TH ST. CR-612 ' (1) ·
'90TH AVE ' (1) ·
'CARTER RD. ' (1) ·
'CR-606 Oslo Rd. ' (1) ·
'CR-611 (45th ST.) ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'CR-632 (65TH ST.) ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-5 (US-1) NB ' (1) ·
'SR-510 Wabasso Rd ' (1) ·
'SR-510(Wabasso Rd)' (1) ·
'SR-60 ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 Osceola Blvd' (1) ·
'SR-60 WB ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR-A1A ' (1) ·
'SR510 Wabasso Road' (1) ·
'SR91 NB TPK 175.4 ' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 NB TPK 180.16' (1) ·
'SR91 NB TPK 189.1 ' (1) ·
'SR91 SB TPK 175.4 ' (1) ·
'SR91 SB TPK 178.03' (1) ·
'SR91 SB TPK 180.16' (1) ·
'SR91 SB TPK 189.1 ' (1) ·
'US-1 (SR-5) ' (1) ·
'US-1 (SR-5) NB ' (1) ·
'US-1 (SR-5) SB ' (1) ·
'VETERANS WALK ' (1)
Number 008:
'0.4 Mi. W of SR-A1A ' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'0.7Mi East of US-1 ' (1) ·
'0.8MI E OF 58TH AVE. ' (1) ·
'1.1MI N OF SR-60 ' (1) ·
'1.2MI East of US-1 ' (1) ·
'1.4 MI S OF OSCEOLA CNTY ' (1) ·
'1.4MI E OF US-1 ' (1) ·
'1.8 MI N OF ST LUCIE CNTY' (1) ·
'10.3Mi. E of SR-91 (TPK) ' (1) ·
'11.6Mi. E of SR-91 (TPK) ' (1) ·
'12.1Mi. E of SR-91 (TPK) ' (1) ·
'13 MI S OF SR 60 ' (1) ·
'13 MI SOUTH OF SR 60 ' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.1 Miles S of Oslo Rd. ' (1) ·
'2.25Mi. W of US-1 ' (1) ·
'2.4MI S OF SR-60@90TH AVE' (1) ·
'2.6MI N OF SR-60 ' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'3.75 Miles North of SR-60' (1) ·
'6.2 Miles N of SR-510 ' (1) ·
'6.4Mi. E of SR-91 (TPK) ' (1) ·
'AT 4TH STREET ' (1) ·
'AT 74TH AVE. ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'I-95 over SR-60 ' (1) ·
'INSIDE RIVERSIDE PARK ' (1) ·
'Oslo Rd. over I-95 ' (1)
Latitude 016:
Longitude 017:
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 47 results in range #1 to #47.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch