Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Apollo Boulevard ' (1) ·
'Banana River Drive' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'Palm Bay Parkway ' (1) ·
'Pineda Causeway ' (1) ·
'Port Malabar BL WB' (1) ·
'SR-520 EB ' (1) ·
'SR-528 EB ' (1) ·
'US 192 WB ' (1) ·
'US-192 EB ' (1) ·
'Viera Blvd EB ' (1) ·
'Viera Blvd WB ' (1) ·
I-95 (1) ·
US-192 EB (1)
700119 (1) ·
700151 (1) ·
700198 (1) ·
700209 (1) ·
700215 (1) ·
700217 (1) ·
700222 (1) ·
700225 (1) ·
700229 (1) ·
700230 (1) ·
700233 (1) ·
700234 (1) ·
704063 (1) ·
704097 (1) ·
704098 (1) ·
705604 (1) ·
705920 (1) ·
705924 (1)
'0.26 Mi South of Pace Dr.' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'I-95 NB - Tillman Canal ' (1) ·
'I-95 over SR-46 ' (1) ·
'I-95 over US-192 ' (1) ·
'SR-520 EB-St. Johns River' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'US 192 WB over Indian Riv' (1) ·
'US-192 EB - Indian Riv ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1) ·
I-95 over Addison Canal (1) ·
I-95 over Wickham Road (1) ·
US-192 EB-St Johns River (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)