Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700084 (1) ·
700085 (1) ·
700086 (1) ·
700087 (1) ·
700089 (1) ·
700090 (1) ·
700091 (1) ·
700150 (1) ·
700151 (1) ·
700153 (1) ·
700197 (1) ·
700198 (1) ·
700216 (1) ·
700218 (1)
'0.6 MILE WEST OF US-1 ' (1) ·
'2.2 Mi East of SR-528 ' (1) ·
'2.7 MI WEST OF SR-9 I-95 ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 EB-St Johns River ' (1) ·
'SR-528 WB at I-95 ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'SR-528 WB-St Johns River ' (1) ·
0.7 Mile N of SR-528 (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)