Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700030 (1) ·
700031 (1) ·
700072 (1) ·
700074 (1) ·
700077 (1) ·
700081 (1) ·
700109 (1) ·
700110 (1) ·
700115 (1) ·
700143 (1) ·
700147 (1) ·
700149 (1)
'1.0MI E OF BANANA RIV DR ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-404 EB - Banana River ' (1) ·
'SR-404 EB - Indian River ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - Banana River ' (1) ·
'SR-404 WB - Indian River ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-528 WB - Indian River ' (1) ·
'SR-528 WB - SR-401 ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.