Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Banana River Relief East' (1) ·
'Banana River Relief West' (1) ·
'Canal ' (1) ·
'City St. & Crane Creek ' (1) ·
'Eau Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'FECRR ' (1) ·
'HAULOVER CANAL ' (1) ·
'Indian River IWW ' (1) ·
'Indian River West Relief' (1) ·
'Nav. Banana River Canal ' (1) ·
'Service Rd & Canal ' (1) ·
'St Johns River ' (1) ·
'St Johns River Relief ' (1) ·
'US-1 ' (1) ·
George King Blvd (1) ·
Indian River ICW (1)
700006 (1) ·
700007 (1) ·
700008 (1) ·
700012 (1) ·
700023 (1) ·
700030 (1) ·
700076 (1) ·
700080 (1) ·
700081 (1) ·
700082 (1) ·
700084 (1) ·
700116 (1) ·
700117 (1) ·
700142 (1) ·
700147 (1) ·
700148 (1) ·
700150 (1) ·
700174 (1) ·
700181 (1) ·
700184 (1) ·
700210 (1) ·
703004 (1) ·
704016 (1) ·
704019 (1)
'0.1 mi W of Banana Rvr Dr' (1) ·
'50ft. East of Fiske Blvd ' (1) ·
'8.6 MILES SOUTH OF US 1 ' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-404 EB - Banana River ' (1) ·
'SR-404 EB - Indian River ' (1) ·
'SR-404 EB-Banana River ' (1) ·
'SR-404 WB - Banana River ' (1) ·
'SR-404 WB - Indian River ' (1) ·
'SR-404 WB-Banana River ' (1) ·
'SR-405 EB - US-1 ' (1) ·
'SR-528 EB-St Johns River ' (1) ·
'SR-528 WB-St Johns River ' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'US-1 - FECRR ' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1) ·
'US-192 EB - Indian River ' (1) ·
'US-192 WB-Indian River ' (1) ·
'US-192 WB-St Johns Relief' (1) ·
SR-518 over Indian River (1) ·
SR-A1A SB- George King (1)
28043878 (1) ·
28050237 (1) ·
28050339 (1) ·
28053027 (1) ·
28070512 (1) ·
28072700 (1) ·
28075792 (1) ·
28121937 (1) ·
28122002 (1) ·
28123289 (1) ·
28123691 (1) ·
28123758 (1) ·
28124312 (1) ·
28124379 (1) ·
28171453 (1) ·
28233806 (1) ·
28241290 (1) ·
28243313 (1) ·
28243318 (1) ·
28270988 (1) ·
28271054 (1) ·
28313959 (1) ·
28370979 (1) ·
28441095 (1)
80352939 (1) ·
80352988 (1) ·
80360835 (1) ·
80370269 (1) ·
80370748 (1) ·
80371385 (1) ·
80371403 (1) ·
80374128 (1) ·
80374130 (1) ·
80374336 (1) ·
80375049 (1) ·
80375518 (1) ·
80375608 (1) ·
80380233 (1) ·
80392343 (1) ·
80392362 (1) ·
80401219 (1) ·
80443323 (1) ·
80451679 (1) ·
80454965 (1) ·
80472199 (1) ·
80483851 (1) ·
80534962 (1) ·
80534993 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)