Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-1 Canal ' (1) ·
'C-37 Canal ' (1) ·
'Canal ' (1) ·
'Canal C-54 ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'F.E.C. Railroad ' (1) ·
'Goat Creek ' (1) ·
'Melbourne Tillman Canal ' (1) ·
'Melbourne-Tillman Canal ' (1) ·
'Sebastian Canal ' (1) ·
'Sebastian Canal East ' (1) ·
'Sebastian Canal West ' (1) ·
'Sykes Creek ' (1) ·
'Tillman Canal ' (1)
'Americana Blvd. ' (1) ·
'Babcock Street ' (1) ·
'Emerson Drive ' (1) ·
'Fountainhead Blvd.' (1) ·
'Hurley Blvd ' (1) ·
'Jupiter Blvd. ' (1) ·
'Malabar Rd ' (1) ·
'Minton Road CR-509' (1) ·
'Palm Bay Parkway ' (1) ·
'Patti Drive ' (1) ·
'Richland Ave ' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'Sea Ray Drive ' (1) ·
'Sykes Creek Pkwy ' (1) ·
'Tadlock Ave. ' (1) ·
'Wilden Road ' (1)
704004 (1) ·
704011 (1) ·
704013 (1) ·
704017 (1) ·
704042 (1) ·
704075 (1) ·
704085 (1) ·
704086 (1) ·
704144 (1) ·
704150 (1) ·
704151 (1) ·
704154 (1) ·
704191 (1) ·
705603 (1) ·
705906 (1) ·
705909 (1) ·
705918 (1) ·
705919 (1) ·
705924 (1)
'.05 mi N of Indian Rvr Co' (1) ·
'.15 mi W of Fleming Grant' (1) ·
'.8 Mile North of SR-520 ' (1) ·
'0.1 mi E of Wickham Road ' (1) ·
'0.1 mi W of Fleming Grant' (1) ·
'0.25 mi N of Valkaria Rd ' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1 mi North of Malabar Rd ' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'100 ft E of Minton Road ' (1) ·
'15ft. N of Pine Island Dr' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'2.5 Miles West of CR-509 ' (1) ·
'8 mi South of Malabar Rd ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 19 results in range #1 to #19.