Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Drainage Canal ' (1) ·
'East Indian River Relief' (1) ·
'LITTLE MUD CREEK ' (1) ·
'Long Creek ' (1) ·
'MOORES CREEK ' (1) ·
'N Fork St. Lucie River ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'S Fork St. Lucie River ' (1) ·
'SR-9 (I-95) ' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'West Indian River Relief' (1) ·
'WILLOUGHBY CREEK ' (1)
'CR-708 ' (1) ·
'East Island Access' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'INDIAN STREET ' (1) ·
'NORTH 2ND STREET ' (1) ·
'SR A1A ' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'St Lucie West Blvd' (1) ·
'US98/441 SR15/700 ' (1) ·
'WB Martin Downs Bd' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB St. Lucie Blvd.' (1) ·
'West Island Access' (1)
890143 (1) ·
890148 (1) ·
890149 (1) ·
890153 (1) ·
890154 (1) ·
890155 (1) ·
890156 (1) ·
890157 (1) ·
894040 (1) ·
894064 (1) ·
940133 (1) ·
940139 (1) ·
940140 (1) ·
940144 (1) ·
940145 (1) ·
940158 (1) ·
945000 (1) ·
949901 (1)
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'1.7 Miles West of I-95 ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'11.4Mi N of Palm Beach Co' (1) ·
'2mi. East of SR-91 ' (1) ·
'3.9Mi N. of Palm Beach Co' (1) ·
'4.7Mi N. of Palm Beach Co' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'7.4Mi N. of Palm Beach Co' (1) ·
'7.9 Mi N of Palm Beach Co' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
'West of Ernest Lyons Bri.' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.