Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'Canal No. 1 ' (1) ·
'Canal No.1 ' (1) ·
'Drainage Canal ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'Indian River East Relief' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'W. Relief Indian River ' (1) ·
'WARNER CREEK ' (1) ·
'WILLOUGHBY CREEK ' (1)
'DIXIE HIGHWAY ' (1) ·
'INDIAN STREET ' (1) ·
'ISLAND WAY ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR-615 ' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB SR- 615 ' (1) ·
'SB SR-615 ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-732 Jensen Bch.' (1) ·
'SR70 EB Okeechobee' (1) ·
'SR70 WB Okeechobee' (1) ·
'US98/441 SR15/700 ' (1)
890113 (1) ·
890130 (1) ·
890131 (1) ·
890138 (1) ·
890146 (1) ·
890153 (1) ·
890154 (1) ·
890155 (1) ·
890156 (1) ·
890157 (1) ·
894040 (1) ·
894044 (1) ·
940136 (1) ·
940143 (1) ·
940146 (1) ·
940147 (1) ·
940148 (1) ·
940149 (1) ·
940157 (1) ·
944012 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'.75mi E. of Indian R Dr. ' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'1 mi. N of Cnty Rd 708 ' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.5 mi N of SR 68 ' (1) ·
'1.5 mi. N. of SR 68 ' (1) ·
'11.4Mi N of Palm Beach Co' (1) ·
'1mi. West of CR-613 ' (1) ·
'2 mi N. of SR 68 ' (1) ·
'2 Mi. N. of SR 68 ' (1) ·
'3.9Mi N. of Palm Beach Co' (1) ·
'4.7Mi N. of Palm Beach Co' (1) ·
'7.4Mi N. of Palm Beach Co' (1) ·
'7.9 Mi N of Palm Beach Co' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 20 results in range #1 to #20.