Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canal 29 (5 mile creek) ' (1) ·
'Haverhill Rd. & U Turns ' (1) ·
'I 95 SR 9 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Lake Ida Road ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Northlake Blvd. ' (1) ·
'Okeechobee Waterway ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'SR 806 (Atlantic Ave.) ' (1) ·
'SR 806 W Atlantic Avenue' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR 811 & FEC RR ' (1)
'CR-714 Indian St. ' (1) ·
'E/B S.R. 704 ' (1) ·
'EB US 98 SR 80 ' (1) ·
'I 95 SR 9 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bvd' (1) ·
'W/B S.R. 704 ' (1) ·
'WB SR 786 ' (1) ·
'WB US 98 SR 80 ' (1)
894062 (1) ·
930457 (1) ·
930459 (1) ·
930462 (1) ·
930481 (1) ·
930488 (1) ·
930489 (1) ·
930492 (1) ·
930495 (1) ·
930503 (1) ·
930504 (1) ·
930506 (1) ·
930507 (1) ·
930516 (1) ·
930525 (1) ·
930539 (1) ·
940152 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.25 mi N of Belvedere Rd' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1st overpass east of I-95' (1) ·
'Between SR 710 and 786 ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'E Congress Ave & N SR 806' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I-95 SR 806 interchange ' (1) ·
'I-95/SR 806 interchange ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SW quadrant PB Int Airprt' (1)
101541 (1) ·
104500 (1) ·
114500 (1) ·
12750 (1) ·
15600 (1) ·
160500 (1) ·
18700 (1) ·
28250 (1) ·
38250 (1) ·
5800 (1) ·
72500 (1) ·
75500 (1) ·
79000 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10063 (1) ·
125788 (1) ·
130993 (1) ·
137065 (1) ·
176174 (1) ·
181308 (1) ·
198658 (1) ·
22121 (1) ·
27066 (1) ·
278468 (1) ·
32445 (1) ·
49014 (1) ·
66364 (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)