Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Burns Road ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'Drainage Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'Kyoto Gardens Dr ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'SR 811 & FEC RR ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'SW 10th St. Lowson Blvd ' (1)
'EB SR 786 ' (1) ·
'EB US 98 SR 80 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R.9) ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'US98/441 SR15/700 ' (1) ·
'WB SR 786 ' (1) ·
'WB US 98 SR 80 ' (1)
890155 (1) ·
890156 (1) ·
930461 (1) ·
930481 (1) ·
930491 (1) ·
930492 (1) ·
930493 (1) ·
930494 (1) ·
930501 (1) ·
930502 (1) ·
930518 (1) ·
930521 (1) ·
930524 (1) ·
930526 (1) ·
930539 (1) ·
940152 (1)
'1 mi. east I-95 on SR 68 ' (1) ·
'1st overpass east of I-95' (1) ·
'7.4Mi N. of Palm Beach Co' (1) ·
'7.9 Mi N of Palm Beach Co' (1) ·
'Between N Lake/PGA Blvds ' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'E Congress Ave & S SR 806' (1) ·
'I 95 Over Lowson Blvd ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR 80/ I-95 interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)