Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-15 Canal ' (1) ·
'C-51 Canal ' (1) ·
'C.S.X. R/R ' (1) ·
'CANAL-17 ' (1) ·
'Canoe Creek ' (1) ·
'Casa Mar Dr ' (1) ·
'E-1 Canal ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'SLOUGH ' (1)
'Australian Ave. ' (1) ·
'CLINT MOORE RD ' (1) ·
'Forest Hill Blvd. ' (1) ·
'Haverhill Rd ' (1) ·
'Hypoluxo Rd ' (1) ·
'I 95 SR 9 ' (1) ·
'INDIANTOWN RD. ' (1) ·
'INDIANTOWN ROAD ' (1) ·
'Lantana Road ' (1) ·
'Lyons Rd ' (1) ·
'LYONS ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Old Dixie Highway ' (1) ·
'Spanish River Blvd' (1) ·
'Woolbright Road ' (1)
930300 (1) ·
930359 (1) ·
930375 (1) ·
930445 (1) ·
930529 (1) ·
934142 (1) ·
934144 (1) ·
934295 (1) ·
934329 (1) ·
934362 (1) ·
934365 (1) ·
934366 (1) ·
934929 (1) ·
934953 (1) ·
934954 (1) ·
935222 (1) ·
935223 (1)
'0.3Mi E of Military Trail' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'0.9 MILES WEST OF TPK ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1.7 miles North of SR 706' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'AT US-441 SR-7 ' (1) ·
'North of P. Beach Airport' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'W of I 95 on Woolbright ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)