Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-15 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'C.S.X. R/R ' (1) ·
'CANAL-17 ' (1) ·
'Canoe Creek ' (1) ·
'Casa Mar Dr ' (1) ·
'E-1 Canal ' (1) ·
'E-2-E Canal ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'US 98-SR 80-WPB Canal ' (1)
'Australian Ave. ' (1) ·
'CLINT MOORE RD ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'Hypoluxo Rd ' (1) ·
'Lake Worth Road ' (1) ·
'Lantana Road ' (1) ·
'Lyons Rd ' (1) ·
'LYONS ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Old Dixie Highway ' (1) ·
'PALMETTO PK RD ' (1) ·
'Spanish River Blvd' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'Woolbright Road ' (1)
930300 (1) ·
930359 (1) ·
930401 (1) ·
930413 (1) ·
930445 (1) ·
930456 (1) ·
930529 (1) ·
931004 (1) ·
934213 (1) ·
934329 (1) ·
934362 (1) ·
934365 (1) ·
934366 (1) ·
934902 (1) ·
934929 (1) ·
934953 (1) ·
934954 (1) ·
935222 (1) ·
935223 (1)
'0.3Mi E of Military Trail' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'AT US-441 SR-7 ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'North of P. Beach Airport' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'W of I 95 on Woolbright ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)