Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-15 Canal ' (1) ·
'C-24 Canal ' (1) ·
'C.S.X. R/R ' (1) ·
'CANAL-17 ' (1) ·
'Canoe Creek ' (1) ·
'Casa Mar Dr ' (1) ·
'E-1 Canal ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 SR 9 ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E1 CANAL ' (1) ·
'Sykes Creek ' (1) ·
'WPB STUB CANAL ' (1)
'Australian Ave. ' (1) ·
'BELVEDERE RD ' (1) ·
'CLINT MOORE RD ' (1) ·
'Crosstown Parkway ' (1) ·
'E Gateway Blvd ' (1) ·
'Forest Hill Blvd. ' (1) ·
'Hypoluxo Rd ' (1) ·
'Lantana Road ' (1) ·
'Lyons Rd ' (1) ·
'LYONS ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Old Dixie Highway ' (1) ·
'Spanish River Blvd' (1) ·
'SR-520 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'Woolbright Road ' (1) ·
'YAMATO RD ' (1)
700193 (1) ·
930300 (1) ·
930319 (1) ·
930359 (1) ·
930434 (1) ·
930445 (1) ·
930529 (1) ·
934208 (1) ·
934329 (1) ·
934362 (1) ·
934365 (1) ·
934366 (1) ·
934928 (1) ·
934929 (1) ·
934953 (1) ·
934954 (1) ·
935222 (1) ·
935223 (1) ·
945274 (1)
'0.1MI W OF I-95 ' (1) ·
'0.3Mi E of Military Trail' (1) ·
'0.3MI E of SR-7 (US-441) ' (1) ·
'0.7 Mi. West of I-95 ' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'AT US-441 SR-7 ' (1) ·
'North of P. Beach Airport' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'W of I 95 on Woolbright ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)