Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
None (1) ·
Boca Raton (1) ·
Daytona Beach (1) ·
Delray Beach (1) ·
Holly Hill (1) ·
Indiantown village (1) ·
Lake Worth (1) ·
Melbourne (1) ·
Merritt Island (1) ·
New Smyrna Beach (1) ·
Palm Bay (1) ·
Palm Beach (1) ·
Palm Beach Gardens (1) ·
Palm Springs village (1) ·
Royal Palm Beach village (1) ·
South Daytona (1)
'CANAL ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'E-1 CANAL ' (1) ·
'EARMAN RIVER CANAL C-17 ' (1) ·
'Halifax Canal ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L.W.D.D. #9 ' (1) ·
'LAKE WORTH TRIBUTARY ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MAPLE CREEK ' (1) ·
'Melbourne Tillman Canal ' (1) ·
'Nav. Banana River Canal ' (1) ·
'Reed Canal ' (1) ·
'RELIEF CANAL ' (1) ·
'Rowland Canal ' (1) ·
'Sykes Creek ' (1) ·
'Tomoka River ' (1) ·
'Tomoka River ' (1) ·
'Turnbull Creek ' (1)
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'DAVIS ROAD ' (1) ·
'Daytona Avenue ' (1) ·
'E. CAMINO REAL ' (1) ·
'Fountainhead Blvd.' (1) ·
'Girard Blvd. ' (1) ·
'GOLDFINCH LANE ' (1) ·
'IBIS WAY ' (1) ·
'ISLAND DRIVE ' (1) ·
'Jupiter Blvd. ' (1) ·
'MAC ARTHUR BLVD ' (1) ·
'MAPP RD ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'Old Dixie Hwy. ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'Richland Ave ' (1) ·
'Turnbull Bay Road ' (1) ·
'US-92 EB ' (1) ·
'West Farms Road ' (1)
704013 (1) ·
704016 (1) ·
705603 (1) ·
705909 (1) ·
790097 (1) ·
794016 (1) ·
794022 (1) ·
795504 (1) ·
796500 (1) ·
894033 (1) ·
894056 (1) ·
934408 (1) ·
934920 (1) ·
934921 (1) ·
934922 (1) ·
934923 (1) ·
934940 (1) ·
935506 (1) ·
936801 (1) ·
937000 (1) ·
937202 (1) ·
937354 (1)
'0.02 MI S/O LPGA Blvd ' (1) ·
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.1 mi E of Wickham Road ' (1) ·
'0.1 MI S of LIGHTHOUSE DR' (1) ·
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.1MI WEST OF A1A ' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.8 MILE N OF 10TH AVE N ' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'1.9 Miles West of US-1 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'US-92 EB -Tomoka River ' (1)
26202200 (1) ·
26211596 (1) ·
26211635 (1) ·
26212592 (1) ·
26212629 (1) ·
26281369 (1) ·
26295449 (1) ·
26382089 (1) ·
26382390 (1) ·
26421675 (1) ·
26490130 (1) ·
27011700 (1) ·
27080035 (1) ·
28004888 (1) ·
28070604 (1) ·
28220892 (1) ·
28233806 (1) ·
29030413 (1) ·
29092052 (1) ·
29095064 (1) ·
29144552 (1) ·
29203187 (1)
80022643 (1) ·
80033398 (1) ·
80043770 (1) ·
80051210 (1) ·
80054760 (1) ·
80075212 (1) ·
80121056 (1) ·
80121064 (1) ·
80121067 (1) ·
80131759 (1) ·
80161820 (1) ·
80285590 (1) ·
80401219 (1) ·
80401763 (1) ·
80413508 (1) ·
80414817 (1) ·
80573537 (1) ·
81005885 (1) ·
81022149 (1) ·
81051074 (1) ·
81052615 (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)