Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930003 (1) ·
930004 (1) ·
930050 (1) ·
930061 (1) ·
930195 (1) ·
930361 (1) ·
934116 (1) ·
934164 (1) ·
934347 (1) ·
936550 (1) ·
936654 (1) ·
936655 (1) ·
936656 (1)
'.1 Mile W of US-A1A ' (1) ·
'0.04Mi W OF A1A ' (1) ·
'0.2 MI W OF A1A ' (1) ·
'0.2MI WEST OF OF A1A ' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1mi. W of US-1. ' (1) ·
'1mi. West of US-1 ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'A1A on Singer Island ' (1) ·
'Just North of SR-850 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)