Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'FL TPK SR-91 ' (1) ·
'FL. TURNPIKE ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LK OSBORNE DR& CENTER DR' (1) ·
'LK OSBORNE DR&CENTER DR ' (1) ·
'Okeechobee Waterway ' (1) ·
'SR-91 TPK & BOCA RIO RD.' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'SR-91/TPK & BOCA RIO RD.' (1) ·
'Turnpike (SR-91) ' (1)
894062 (1) ·
934166 (1) ·
934302 (1) ·
934307 (1) ·
934367 (1) ·
934907 (1) ·
934908 (1) ·
934909 (1) ·
934925 (1) ·
934926 (1) ·
934945 (1) ·
934946 (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)