Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
705925 (1) ·
796412 (1) ·
935301 (1) ·
935302 (1) ·
935502 (1) ·
937005 (1) ·
937006 (1) ·
937007 (1) ·
945013 (1) ·
945014 (1) ·
945015 (1) ·
945016 (1)
'0.1 MI S of PGA BLVD ' (1) ·
'0.1 Miles S. of Ave. D ' (1) ·
'0.1MI S OF OLD BOYNTON ' (1) ·
'0.1MI W OF MILITARY TRAIL' (1) ·
'0.2 MI W OF LINDELL BLVD ' (1) ·
'0.26 Miles North of CR-68' (1) ·
'0.3 Mi N of Orange Ave. ' (1) ·
'0.3 Miles North of CR-68 ' (1) ·
'2 Mi West of Jupiter Blvd' (1) ·
'Canal View Blvd Intrsectn' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)