Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6th Avenue South ' (1) ·
'C-24 CANAL ' (1) ·
'F.E.C. Railroad ' (1) ·
'FECRR ' (1) ·
'L-5 Canal ' (1) ·
'Lake Ashby Canal ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'Spruce Creek ' (1) ·
'SR 806 (Atlantic Ave.) ' (1) ·
'SR 806 W Atlantic Avenue' (1) ·
'SR 91 TPK ' (1) ·
'TEN MILE CREEK ' (1) ·
'Tillman Canal ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
'CARLTON RD (CR613)' (1) ·
'CR-4009 ' (1) ·
'ELEVEN MILE ROAD ' (1) ·
'HOOD RD 110.944 ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I 95 SR 9 ' (1) ·
'I 95 SR 9 SB ' (1) ·
'Levee Road ' (1) ·
'Minton Road CR-509' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'SR-415 ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SR70 EB Okeechobee' (1) ·
'SR70 WB Okeechobee' (1) ·
'US-1 SB ' (1)
704075 (1) ·
704150 (1) ·
704151 (1) ·
790004 (1) ·
790035 (1) ·
794193 (1) ·
930187 (1) ·
930198 (1) ·
930267 (1) ·
930268 (1) ·
930367 (1) ·
930441 (1) ·
930458 (1) ·
930503 (1) ·
930504 (1) ·
930804 (1) ·
940019 (1) ·
940038 (1) ·
940136 (1) ·
940157 (1)
'.5mi East US1 Lakeworth ' (1) ·
'0.8 MI S OF SR-70 ' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'1mi. West of CR-613 ' (1) ·
'2.1MI S of SR-70 ' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'I-95 SR 806 interchange ' (1) ·
'I-95/SR 806 interchange ' (1) ·
'SR-415 - Lake Ashby Canal' (1) ·
'US-1 SB over FECRR ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)