Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River Drive ' (1) ·
'BOYNTON CANAL ' (1) ·
'BULLDOG CANAL ' (1) ·
'CANAL E-14 ' (1) ·
'Drainage Canal Sand Cut ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'L-38 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'M CANAL ' (1) ·
'NORTH CANAL ' (1) ·
'TEN MILE CREEK ' (1) ·
'WEST PALM BEACH CANAL ' (1)
'36TH STREET ' (1) ·
'HAVERHILL ROAD ' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'JEANNE AVE ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD (SB) ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'MERCER AVE ' (1) ·
'NORTH SHORE DRIVE ' (1) ·
'SHINN RD (CR-609A)' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR-528 ' (1) ·
'SR-528 WB ' (1) ·
'SW 18th STREET EB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'US98&441 SR700&15' (1) ·
'W. CAMINO REAL ' (1)
700026 (1) ·
700113 (1) ·
884058 (1) ·
884060 (1) ·
930015 (1) ·
930091 (1) ·
934256 (1) ·
934406 (1) ·
934900 (1) ·
934901 (1) ·
934913 (1) ·
934918 (1) ·
934938 (1) ·
934939 (1) ·
934952 (1) ·
937702 (1) ·
937704 (1) ·
937708 (1) ·
940027 (1) ·
945261 (1)
'0.2Mi S of 45TH ST(CR702)' (1) ·
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'0.7MI Wof SW DARWIN BLVD.' (1) ·
'1.1 MILES NORTH OF SR-70 ' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2.55 Miles East of SR-3 ' (1) ·
'250FT N of BELVEDERE RD ' (1) ·
'4.1Mi N of WPB Canal ' (1) ·
'650FT E OF AUSTRALIAN AVE' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'E Congress Ave. & W I-95 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)