Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'C-3 Canal ' (1) ·
'CANAL ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'Groover Creek ' (1) ·
'Halifax Canal ' (1) ·
'Lateral "A" Canal ' (1) ·
'Little Haw Creek ' (1) ·
'LWDD E-1 Canal ' (1) ·
'RCA CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'Salerno Creek ' (1)
'37th Street ' (1) ·
'Airport Road ' (1) ·
'ALLAMANDA BLVD. ' (1) ·
'AUDUBON CSWY ' (1) ·
'Center Avenue ' (1) ·
'Lake Ida Road ' (1) ·
'Lake Worth Road ' (1) ·
'MARINA BLVD. ' (1) ·
'Marsh Road ' (1) ·
'NORFOLK BLVD. ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'PROSPERITY FARM RD' (1) ·
'SE Ebbtide Ave. ' (1)
794036 (1) ·
794067 (1) ·
795521 (1) ·
884101 (1) ·
894047 (1) ·
894055 (1) ·
930413 (1) ·
934137 (1) ·
934139 (1) ·
934943 (1) ·
934944 (1) ·
934963 (1) ·
936451 (1) ·
937003 (1)
'.06mi E OF LANDS END ROAD' (1) ·
'0.10 MI S of BURNS ROAD ' (1) ·
'0.1Mi E of Tymber Crk Rd.' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.4MI N of COVE ROAD ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1 miles North of US-92 ' (1) ·
'1Mi E of CR809/Military T' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'At Intersection w LPGA BL' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)