Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
880058 (1) ·
880066 (1) ·
880090 (1) ·
880091 (1) ·
890001 (1) ·
890021 (1) ·
890148 (1) ·
890159 (1) ·
930265 (1) ·
930407 (1) ·
930486 (1) ·
934297 (1) ·
941001 (1)
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'Turnpike at Stuart exit. ' (1) ·
'West of Ernest Lyons Bri.' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)