Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'90th Ave. ' (1) ·
'Banana River Relief ' (1) ·
'C-15 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL C-17 ' (1) ·
'CR 702 45th Street ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'FECRR ' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'Spruce Creek S. Relief ' (1) ·
'SR 91 TPK ' (1) ·
'SR-513 ' (1) ·
'SR-806 Atlantic Ave ' (1)
'CONGRESS AVE ' (1) ·
'CR68 ORNG AV 156.1' (1) ·
'I 95 SR 9 ' (1) ·
'ISLAND WAY ' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PARK AVE. W. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR A1A ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-528 ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1)
700002 (1) ·
700027 (1) ·
700083 (1) ·
700103 (1) ·
700114 (1) ·
700149 (1) ·
790157 (1) ·
790158 (1) ·
880101 (1) ·
894044 (1) ·
930460 (1) ·
930499 (1) ·
930500 (1) ·
930520 (1) ·
931006 (1) ·
934164 (1) ·
934470 (1) ·
940056 (1) ·
940084 (1)
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'1.5 miles South of SR 806' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.85 Miles East of SR-3 ' (1) ·
'2.9 MI N OF SR-70 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'At Exit 74 ' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-80 & Military Trail ' (1) ·
'US-1 NB - Spruce Cr. S. ' (1) ·
'US-1SB - Spruce Cr. S. ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
12318 (1) ·
12839 (1) ·
171592 (1) ·
181308 (1) ·
2275 (1) ·
22989 (1) ·
33832 (1) ·
36435 (1) ·
369555 (1) ·
43375 (1) ·
4414 (1) ·
74605 (1) ·
75473 (1) ·
8328 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)