Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'CLINT MOORE RD ' (1) ·
'CR-512 ' (1) ·
'CR-92 EB ' (1) ·
'CR-92 WB ' (1) ·
'Hood Road ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'MARGINAL RD ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'Spanish River Blvd' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SW 48th Avenue ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1)
790185 (1) ·
790186 (1) ·
794121 (1) ·
794186 (1) ·
796500 (1) ·
884067 (1) ·
894061 (1) ·
930398 (1) ·
930401 (1) ·
934214 (1) ·
934271 (1) ·
934272 (1) ·
934920 (1) ·
934921 (1) ·
934929 (1) ·
935223 (1) ·
940152 (1)
'0.3Mi E of Military Trail' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.4 Mi West of US 17-92 ' (1) ·
'0.4 Mile West of US 17-92' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.8mi. N of CR-714 ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-1 NB - Tomoka River ' (1) ·
'US-1 SB - Tomoka River ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.