Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Barge Canal ' (1) ·
'Boca Inlet ' (1) ·
'Boynton Inlet ' (1) ·
'FEC RR(Olympia Overpass)' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'Intracoastal Waterway ' (1) ·
'MIAMI CANAL ' (1) ·
'SR 91 TPK (STUART INT) ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1)
'A1A ' (1) ·
'CORKSCREW BLVD. ' (1) ·
'CR-707 (BEACH RD) ' (1) ·
'EB SR 802 Lake Ave' (1) ·
'NB SR-5 (US-1) ' (1) ·
'NW 2ND ST ' (1) ·
'NW 5TH STREET ' (1) ·
'SB SR-5 (US-1) ' (1) ·
'SR A1A ' (1) ·
'SR-3 ' (1) ·
'SR-A1A ' (1) ·
'SR91 SB TPK 100.15' (1) ·
'SR91 SB TPK 134.32' (1) ·
'WB SR 802 Lake Ave' (1) ·
'WOOLBRIGHT ROAD ' (1)
700201 (1) ·
890001 (1) ·
890021 (1) ·
890068 (1) ·
930030 (1) ·
930056 (1) ·
930060 (1) ·
930061 (1) ·
930104 (1) ·
930142 (1) ·
930214 (1) ·
930318 (1) ·
930360 (1) ·
934502 (1) ·
940045 (1)
'0.25MI E OF US 1 ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'200' East of US-1(SR-5) ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'SR-3 NB over Barge Canal ' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)