Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930053 (1) ·
930402 (1) ·
930407 (1) ·
930408 (1) ·
930461 (1) ·
930462 (1) ·
930465 (1) ·
930472 (1) ·
930473 (1) ·
930474 (1) ·
930524 (1) ·
930525 (1) ·
930527 (1) ·
930539 (1)
'.25m W of US-1 on US-98 ' (1) ·
'2 miles west of Turnpike ' (1) ·
'4 miles west of SR 7 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'PUMP STA. AT 20 MI. BEND ' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR-700 CANAL POINT ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.