Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th Street Canal ' (1) ·
'BESSEY CREEK ' (1) ·
'Canal to Bulow Creek ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'Drainage Ditch ' (1) ·
'E-1 Canal ' (1) ·
'E-1-E CANAL ' (1) ·
'E3-canal ' (1) ·
'Konomac Canal ' (1) ·
'KRUEGER CREEK ' (1) ·
'L-6 Canal ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MAPLE CREEK ' (1) ·
'Nova Canal ' (1) ·
'Reed Canal ' (1) ·
'SWA Retention Canal ' (1) ·
'Triple box culvert ' (1) ·
'Underhill Slough ' (1)
'CR-A1A(OCEAN BLVD)' (1) ·
'Fort Florida Road ' (1) ·
'Fountainhead Blvd.' (1) ·
'Hypoluxo Rd ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'I 95 SR 9 ' (1) ·
'Jog Road ' (1) ·
'Lake Harney Road ' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'Lantana Road ' (1) ·
'MAPP RD ' (1) ·
'Melaleuca Lane ' (1) ·
'MURPHY RD ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'Old Kings Rd ' (1) ·
'SANDALFOOT BLVD ' (1) ·
'Saul Street ' (1) ·
'SR-5A ' (1) ·
'SR-807 Congress Av' (1) ·
'Williamson Blvd ' (1)
705603 (1) ·
790177 (1) ·
794050 (1) ·
794074 (1) ·
794096 (1) ·
794162 (1) ·
796518 (1) ·
890087 (1) ·
890112 (1) ·
890120 (1) ·
894033 (1) ·
930178 (1) ·
930466 (1) ·
934158 (1) ·
934345 (1) ·
934346 (1) ·
934360 (1) ·
934361 (1) ·
934362 (1) ·
934366 (1) ·
934403 (1)
'0.1 mi E of Wickham Road ' (1) ·
'0.3MI E OF SR-7 US-441 ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.5 mi. N of N Lakes Blvd' (1) ·
'0.7 Mi N of Old Dixie Hwy' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.0mile south of SR-80 ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.4 miles North of US-92 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'2.6 Mi. S of SR-710 ' (1) ·
'2MI E of SR-76 ' (1) ·
'4 Mi South of Maytown Rd.' (1) ·
'ADJACENT TO US-441 ' (1) ·
'At Reed Canal Road ' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'N of Roosevelt Bridge ' (1) ·
'SR-5A over Nova Canal ' (1)
26200974 (1) ·
26341358 (1) ·
26342010 (1) ·
26342072 (1) ·
26352535 (1) ·
26352894 (1) ·
26362838 (1) ·
26394300 (1) ·
26454160 (1) ·
26490150 (1) ·
27080035 (1) ·
27112563 (1) ·
27115100 (1) ·
27131050 (1) ·
28070604 (1) ·
28470565 (1) ·
28515436 (1) ·
29091610 (1) ·
29092945 (1) ·
29125374 (1) ·
29245056 (1)
80051800 (1) ·
80055250 (1) ·
80074641 (1) ·
80074643 (1) ·
80074938 (1) ·
80082890 (1) ·
80102240 (1) ·
80115311 (1) ·
80121942 (1) ·
80121946 (1) ·
80135670 (1) ·
80154440 (1) ·
80161820 (1) ·
80175123 (1) ·
80401763 (1) ·
81003691 (1) ·
81011090 (1) ·
81013072 (1) ·
81052755 (1) ·
81085329 (1) ·
81205307 (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)