Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
884003 (1) ·
884038 (1) ·
884047 (1) ·
884063 (1) ·
884064 (1) ·
884081 (1) ·
884103 (1) ·
934506 (1) ·
934516 (1) ·
935306 (1) ·
935506 (1) ·
935508 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'150 FT E of SW 10TH ST ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'AT 141st ST ' (1) ·
'At 74th Avenue ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At CR-615 (66th Ave) ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 12 results in range #1 to #12.