Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Congress Ave. ' (1) ·
'COURTENAY PARKWAY ' (1) ·
'SR91 NB TPK 175.4 ' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 NB TPK 180.16' (1) ·
'SR91 NB TPK 189.1 ' (1) ·
'SR91 SB TPK 175.4 ' (1) ·
'SR91 SB TPK 178.03' (1) ·
'SR91 SB TPK 180.16' (1) ·
'SR91 SB TPK 189.1 ' (1) ·
NASA CAUSEWAY EB (1) ·
NASA CAUSEWAY WB (1)
703001 (1) ·
703002 (1) ·
703004 (1) ·
880057 (1) ·
880058 (1) ·
880059 (1) ·
880060 (1) ·
880065 (1) ·
880066 (1) ·
880067 (1) ·
880068 (1) ·
930163 (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)