Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'Dirksen Dr ' (1) ·
'Dirksen Drive ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'Sawgrass Creek ' (1) ·
'SR-520 ' (1) ·
'St Johns River Relief ' (1) ·
'ST LUCIE CANAL ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'W. Relief Indian River ' (1)
700018 (1) ·
700023 (1) ·
700052 (1) ·
790042 (1) ·
790100 (1) ·
890066 (1) ·
890138 (1) ·
930015 (1) ·
930273 (1) ·
934221 (1) ·
934929 (1) ·
940009 (1)
'1 mile North of SR 812 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'AT US-441 SR-7 ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'US-192 WB-St Johns Relief' (1) ·
'US-192EB - Sawgrass Creek' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)