Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Owner 022:
FDOT
& Channel 061:
No noticeable or noteworthy deficiencies which affect the condition of the channel.
Use the filters below to narrow your results.
'C-17 Canal ' (1) ·
'C-54 Canal ' (1) ·
'Fellsmere Canal ' (1) ·
'L-6 Canal ' (1) ·
'Lake Worth Creek Canal ' (1) ·
'Lake Worth Lagoon ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'St.Lucie River ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'Tomoka River ' (1) ·
'Turkey Creek ' (1) ·
Fellsmere Canal (1) ·
Sebastian River (1)
700203 (1) ·
700224 (1) ·
700231 (1) ·
700232 (1) ·
700238 (1) ·
790201 (1) ·
790202 (1) ·
890158 (1) ·
930466 (1) ·
930485 (1) ·
930524 (1) ·
930534 (1) ·
930541 (1) ·
930542 (1) ·
930543 (1) ·
930544 (1) ·
930547 (1)
'.25 mi N of SR 706 ' (1) ·
'.3 mi N of SR 706 ' (1) ·
'0.2 mi E of SR5 on SRA1A ' (1) ·
'0.25 N of SR 706 ' (1) ·
'0.25mi. east of I-95 ' (1) ·
'03 mi N of SR 706 ' (1) ·
'1.0mile south of SR-80 ' (1) ·
'3mi East of SR5 on A1A ' (1) ·
'Buffer Preserve Drive ' (1) ·
'I-4 EB over Tomoka River ' (1) ·
'I-4 WB over Tomoka River ' (1) ·
'North of Belvedere Rd ' (1) ·
'Over Fellsmere Canal ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'US-1 over Turkey Creek ' (1) ·
Over Fellsmere Canal (1) ·
US-1 over Sebastian River (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)