Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Deck 058 :
Fair or
Good
& Channel 061:
No noticeable or noteworthy deficiencies which affect the condition of the channel.
Use the filters below to narrow your results.
700224 (1) ·
796414 (1) ·
890158 (1) ·
891000 (1) ·
930466 (1) ·
930485 (1) ·
930524 (1) ·
930534 (1) ·
945264 (1) ·
945267 (1)
'0.1MI W of N QUICK CIRCLE' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.3MI E OF DARWIN BLVD ' (1) ·
'1.0mile south of SR-80 ' (1) ·
'3.7 MI S. OF STUART INT. ' (1) ·
'3mi East of SR5 on A1A ' (1) ·
'North of Belvedere Rd ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
US-1 over Sebastian River (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)