Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'90th Ave. ' (1) ·
'Bear Wildlife Crossing ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'CR 512 (Fellsmere Rd.) ' (1) ·
'Deer Wildlife Crossing ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'I-95 ' (1) ·
'SR 91 TPK ' (1) ·
'SR-46 ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'St Lucie River / SR-707 ' (1) ·
'WB SR 80 ' (1)
700188 (1) ·
700230 (1) ·
790205 (1) ·
790207 (1) ·
790247 (1) ·
880100 (1) ·
880101 (1) ·
880105 (1) ·
890152 (1) ·
930053 (1) ·
930265 (1) ·
930381 (1) ·
930419 (1) ·
930450 (1) ·
930476 (1) ·
930533 (1) ·
934297 (1)
'.25m W of US-1 on US-98 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'CR-516 over I-95 ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'I-95 over SR-46 ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 400 WB over Deer Wildl' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.