Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bear Wildlife Crossing ' (1) ·
'Belvedere Road ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deer Wildlife Crossing ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'SR 91 TPK ' (1) ·
'SR-68 ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'St Lucie River / SR-707 ' (1) ·
'WB SR 80 ' (1)
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'Hypoluxo Rd ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB SR 807 ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'NB US-1 / SR-5 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB SR 807 ' (1) ·
'SR 400 WB ' (1) ·
'SR-400 ' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-98 (SR-80) ' (1) ·
'Woolbright Road ' (1)
790205 (1) ·
790207 (1) ·
790247 (1) ·
890152 (1) ·
930053 (1) ·
930301 (1) ·
930307 (1) ·
930381 (1) ·
930419 (1) ·
930450 (1) ·
930476 (1) ·
930486 (1) ·
930487 (1) ·
930488 (1) ·
930489 (1) ·
930533 (1) ·
940096 (1) ·
940097 (1) ·
940102 (1)
'.25m W of US-1 on US-98 ' (1) ·
'0.25 mi N of Belvedere Rd' (1) ·
'1 mile North of SR 80 ' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'I 95 Exit 56 ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'Just North of SR70 on I95' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 400 WB over Deer Wildl' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.