Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bear Wildlife Crossing ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deer Wildlife Crossing ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'Palmetto Park Road ' (1) ·
'SR 794 Yamato Rd ' (1) ·
'SR 91 TPK ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'St Lucie River / SR-707 ' (1) ·
'WB SR 80 ' (1)
790205 (1) ·
790207 (1) ·
790247 (1) ·
890152 (1) ·
930053 (1) ·
930188 (1) ·
930189 (1) ·
930201 (1) ·
930381 (1) ·
930419 (1) ·
930450 (1) ·
930476 (1) ·
930533 (1) ·
940101 (1)
'.25m W of US-1 on US-98 ' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'Boca Raton ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'Just North of Exit 48 ' (1) ·
'Just South of Exit 48 ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 400 WB over Deer Wildl' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10930 (1) ·
157018 (1) ·
177838 (1) ·
28628 (1) ·
40772 (1) ·
50315 (1) ·
50848 (1) ·
51900 (1) ·
82412 (1) ·
88900 (1)
Showing below up to 14 results in range #1 to #14.