Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR-707(Citrus Ave)' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB SR 807 ' (1) ·
'NB US-1 / SR-5 ' (1) ·
'Saxon Blvd EB ' (1) ·
'Saxon Blvd WB ' (1) ·
'SB SR 807 ' (1) ·
'SR 400 WB ' (1) ·
'SR-400 ' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-98 (SR-80) ' (1)
700052 (1) ·
700127 (1) ·
790082 (1) ·
790166 (1) ·
790167 (1) ·
790205 (1) ·
790207 (1) ·
790247 (1) ·
890152 (1) ·
930053 (1) ·
930381 (1) ·
930419 (1) ·
930450 (1) ·
930476 (1) ·
930533 (1) ·
940047 (1)
'.25m W of US-1 on US-98 ' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'I-95 NB - SR-520 ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'I-95 SB over US-1 ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 400 WB over Deer Wildl' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.