Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CONGRESS AVE (NB) ' (1) ·
'CONGRESS AVE (SB) ' (1) ·
'LINTON BLVD. ' (1) ·
'NB I 95 to Gateway' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'PLM BEACH LAKES BL' (1) ·
'Spanish River Blvd' (1) ·
'SR-528 EB ' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'St Lucie West Blvd' (1) ·
'US-1 SB ' (1) ·
'WB SR808 Glades Rd' (1)
700075 (1) ·
700151 (1) ·
930245 (1) ·
930435 (1) ·
930552 (1) ·
934148 (1) ·
934149 (1) ·
934155 (1) ·
934156 (1) ·
934483 (1) ·
937709 (1) ·
940133 (1) ·
949901 (1)
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.1MI W OF DIXIE HIGHWAY ' (1) ·
'0.5MI N OF 45TH STREET ' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'800 ft West of I 95 ' (1) ·
'Spanish R & I95 Csxrr Can' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'US-1 SB - SR-404 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)