Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River Drive ' (1) ·
'Bear Wildlife Crossing ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deer Wildlife Crossing ' (1) ·
'F.E.C. Railroad ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'I 95 and SR 704 ' (1) ·
'I-95 ' (1) ·
'SR 91 TPK ' (1) ·
'SR-3 ' (1) ·
'SR-401 ' (1) ·
'SR-513 ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'St Lucie River / SR-707 ' (1) ·
'WB SR 80 ' (1)
'Babcock St(CR-507)' (1) ·
'CR-4118 ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'NB SR 807 ' (1) ·
'NB US-1 / SR-5 ' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'SB SR 807 ' (1) ·
'SR 400 WB ' (1) ·
'SR-400 ' (1) ·
'SR-404 EB ' (1) ·
'SR-528 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-98 (SR-80) ' (1) ·
'WB SR704 to SB I95' (1)
700017 (1) ·
700074 (1) ·
700111 (1) ·
700113 (1) ·
700149 (1) ·
700160 (1) ·
704150 (1) ·
704151 (1) ·
790066 (1) ·
790205 (1) ·
790207 (1) ·
790247 (1) ·
890152 (1) ·
930053 (1) ·
930381 (1) ·
930419 (1) ·
930450 (1) ·
930469 (1) ·
930476 (1) ·
930533 (1)
'.25m W of US-1 on US-98 ' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'2.55 Miles East of SR-3 ' (1) ·
'2.7Mi. N of SR-44 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'Babcock Street over I-95 ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'I-95 SR 704 interchange ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 400 WB over Deer Wildl' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-528 EB over SR-3 ' (1) ·
'SR-528 WB - SR-401 ' (1) ·
'SR-528 WB over SR-3 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.