Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
704190 (1) ·
790203 (1) ·
790204 (1) ·
790206 (1) ·
790208 (1) ·
790229 (1) ·
790241 (1) ·
790247 (1) ·
930381 (1) ·
930419 (1) ·
930552 (1) ·
931013 (1) ·
940162 (1) ·
940163 (1)
'1.5mi N of SR-68 ' (1) ·
'2.9 Miles South of US-192' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'Bellevue Avenue over I-95' (1) ·
'I-4 EB Ramp A to US-92 ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'I-95 NB over SR-421 ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'Palm Beach Garden Interch' (1) ·
'Spanish R & I95 Csxrr Can' (1) ·
'SR 400 - Dear Crossing ' (1) ·
'SR 400 EB - Bear Crossing' (1) ·
'SR 400 EB - Cougar Crossi' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)