Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR 708 ' (1) ·
'CR 709 & FECRR ' (1) ·
'CSX Railroad ' (1) ·
'I-95 (SR-9) ' (1) ·
'Lateral Canal 30 ' (1) ·
'None ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'SR-91 Fl. Tpk ' (1)
890117 (1) ·
890118 (1) ·
890121 (1) ·
890122 (1) ·
930172 (1) ·
930173 (1) ·
930380 (1) ·
930384 (1) ·
930390 (1) ·
930435 (1) ·
930442 (1) ·
930443 (1) ·
930455 (1) ·
940115 (1) ·
940116 (1) ·
940126 (1) ·
940127 (1)
'.75 Mile South Midway Rd.' (1) ·
'0.75 mile South of SR 708' (1) ·
'1.3 mile S of Linton Rd. ' (1) ·
'1.3mi. South of Linton ' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'2 miles N of Atlantic Ave' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'I 95 SR 706 Interchange ' (1) ·
'I-95 / SR 706 Interchange' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'Tpk. SR 706 Interchange ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.