Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR 782 Linton Blvd ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'CSX Railroad ' (1) ·
'DIRT FARM ROAD ' (1) ·
'Hypoluxo Rd. ' (1) ·
'Hypoluxo Road ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'Lake Ida Road ' (1) ·
'Lantana Road ' (1) ·
'Lateral Canal 30 ' (1) ·
'SR 806 (Atlantic Ave.) ' (1) ·
'SR 806 W Atlantic Avenue' (1) ·
'SW 10th St. Lowson Blvd ' (1)
'Hypoluxo Rd ' (1) ·
'Hypoluxo to SB I95' (1) ·
'I 95 SR 9 ' (1) ·
'I 95 SR 9 SB ' (1) ·
'Lantana to I 95 SB' (1) ·
'LINTON BLVD. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'Peninsula Corp Dr ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 to Lantana' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1)
930274 (1) ·
930275 (1) ·
930276 (1) ·
930298 (1) ·
930299 (1) ·
930307 (1) ·
930442 (1) ·
930443 (1) ·
930455 (1) ·
930495 (1) ·
930496 (1) ·
930499 (1) ·
930500 (1) ·
930501 (1) ·
930502 (1) ·
930503 (1) ·
930504 (1) ·
931002 (1) ·
931003 (1) ·
934483 (1)
'0.8Mi W of JOG/CARTER RD.' (1) ·
'1.3 mile S of Linton Rd. ' (1) ·
'1.3mi. South of Linton ' (1) ·
'1.5 miles South of SR 806' (1) ·
'2 miles N of Atlantic Ave' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'E Congress Ave & N SR 806' (1) ·
'E Congress Ave & S SR 806' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'I 95 Over Lowson Blvd ' (1) ·
'I-95 SR 806 interchange ' (1) ·
'I-95/SR 806 interchange ' (1) ·
'Lantana I 95 Interchange ' (1)
101541 (1) ·
104500 (1) ·
12000 (1) ·
13000 (1) ·
14000 (1) ·
2000 (1) ·
203082 (1) ·
21000 (1) ·
38000 (1) ·
39250 (1) ·
43500 (1) ·
6400 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
15000 (1) ·
176174 (1) ·
181308 (1) ·
20820 (1) ·
22555 (1) ·
24290 (1) ·
3000 (1) ·
352347 (1) ·
36435 (1) ·
65930 (1) ·
68099 (1) ·
75472 (1)
Showing below up to 20 results in range #1 to #20.