Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
890001 (1) ·
890021 (1) ·
890068 (1) ·
890108 (1) ·
890109 (1) ·
890114 (1) ·
890117 (1) ·
890118 (1) ·
890119 (1) ·
890121 (1) ·
890122 (1) ·
890126 (1) ·
890128 (1) ·
890129 (1) ·
890152 (1) ·
890159 (1)
'.25mi W OF I-95 ' (1) ·
'0.1 MILE WEST OF I-95 ' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'CR 76A over I-95 ' (1) ·
'NB I-95 / SR 714 ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'SB I-95 / SR-714 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'South of St Lucie Canal ' (1) ·
'South of St. Lucie Canal ' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'Turnpike at Stuart exit. ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)