Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Status:
AM
& Service On 042a:
Highway
& Channel 061:
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition.
Use the filters below to narrow your results.
'Banana River Relief East' (1) ·
'Banana River Relief West' (1) ·
'C-15 Canal ' (1) ·
'C-18 CANAL ' (1) ·
'CANAL C-108 ' (1) ·
'Deep Creek ' (1) ·
'FIVE MILE CREEK ' (1) ·
'Halifax Canal Lateral ' (1) ·
'Indian River Relief East' (1) ·
'L-5 Canal ' (1) ·
'Lake Ashby Canal ' (1) ·
'N. NEW RIVER CANAL ' (1) ·
'Raulerson Canal ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'Samsula Canal ' (1) ·
'Spruce Creek ' (1) ·
'St Johns River ' (1) ·
'St. Johns River ' (1) ·
'Turnbull Creek ' (1) ·
Six Mile Creek (1)
'CR611B(EDWARDS RD)' (1) ·
'Indiantown Rd. ' (1) ·
'Jackson Street ' (1) ·
'JORGENSEN RD ' (1) ·
'Jungle Road ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB US-27 SR-25 ' (1) ·
'OKEELANTA RD. ' (1) ·
'SB I 95 to Cong Av' (1) ·
'SB US-27 SR-25 ' (1) ·
'SR-404 WB ' (1) ·
'SR-415 ' (1) ·
'SR-44 ' (1) ·
'SR-520 WB ' (1) ·
'SR-700 ' (1) ·
'SR-76 ' (1) ·
'SR-786(PGA BLVD) ' (1) ·
'US-17 ' (1) ·
'US-1SB ' (1) ·
SR-46 (1)
700078 (1) ·
700080 (1) ·
700082 (1) ·
700194 (1) ·
700200 (1) ·
790002 (1) ·
790035 (1) ·
790039 (1) ·
790124 (1) ·
790155 (1) ·
794080 (1) ·
796412 (1) ·
890127 (1) ·
930352 (1) ·
930353 (1) ·
930356 (1) ·
930391 (1) ·
930444 (1) ·
930445 (1) ·
930451 (1) ·
934522 (1) ·
940070 (1) ·
945252 (1)
'.25 mi East of I-95 ' (1) ·
'.5 mi East of I-95 ' (1) ·
'0.1 mi East of Linda Road' (1) ·
'0.2MI S OF N MACEDO BLVD.' (1) ·
'0.85 mile South of Linton' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.6 Mi E of SR-415 ' (1) ·
'1MI E of MCNEIL ROAD ' (1) ·
'3Mi. S of CR-717 ' (1) ·
'AT US-27 ' (1) ·
'Canal View Blvd Intrsectn' (1) ·
'Palm Beach - Broward Line' (1) ·
'PGA Blvd 2.3mi. W of TPK.' (1) ·
'SR-404 WB-Banana River ' (1) ·
'SR-404 WB-Indian River ' (1) ·
'SR-415 - Lake Ashby Canal' (1) ·
'SR-415 - St. Johns River ' (1) ·
'SR-520 WB -St Johns River' (1) ·
'US-1 SB - Spruce Creek ' (1) ·
'US-17 over Deep Creek ' (1) ·
SR-46 over Six Mile Cr (1)
26200870 (1) ·
26200920 (1) ·
26252840 (1) ·
26363600 (1) ·
26470182 (1) ·
26502431 (1) ·
26560311 (1) ·
27064891 (1) ·
27201582 (1) ·
27243079 (1) ·
28122646 (1) ·
28123289 (1) ·
28124379 (1) ·
28221061 (1) ·
28395620 (1) ·
28480959 (1) ·
28563417 (1) ·
29004196 (1) ·
29010069 (1) ·
29051082 (1) ·
29081340 (1) ·
29094796 (1)
80052320 (1) ·
80052570 (1) ·
80083165 (1) ·
80095948 (1) ·
80152053 (1) ·
80212904 (1) ·
80213056 (1) ·
80313151 (1) ·
80321860 (1) ·
80321939 (1) ·
80371403 (1) ·
80380233 (1) ·
80383781 (1) ·
80424015 (1) ·
80522244 (1) ·
80543618 (1) ·
80571308 (1) ·
80580732 (1) ·
81002850 (1) ·
81022968 (1) ·
81060965 (1) ·
81123701 (1) ·
81232561 (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)